The Hwy 75 bridge over the Morris River is open with one lane traffic in either direction. Water is just underneath it.
The town of Morris dike has been shaped back into it's non-flood configuration.
A pump has been setup to pump out the remaining water in the Morris Cemetery.
The coulee on the north side of our farmyard is slowly regaining it's shape!
Still lots of water to flow up river and show us these lower fields.
Our dike culvert was opened on the morning of May 11, 2009. The 35mm of rain and counting is showing here as the yard drains.
Go back to the main 2009 Farm Flood page.
Last updated May 18/09